Rosert Crype Suitiinc, Harry Froyp Suminc, and Soura Sine Trust anp Savincs Banx or Prorta, Trustees, Claimants, v. StaTE OF ItLtNors, Respondent.
Headnotes
- Hicuways-consequential damages by reason of public improvement2 Is so as to increase the flow from a dominant estate over a servient estate.
- Same-flooding by increased surface waters. Evidence showed that drainage was changed to claimants’ damage.
On March 24, 1960, claimants filed their complaint seeking an award in the amount of $4,000.00 for damages sustained by reason of flooding, caused by the construction of S.B.I. Route No. 29.
The complaint alleges that, prior to May of 1958, surface waters flowed southwesterly along the northwesterly line of the Chicago, Rock Island and Pacific Railroad, and drained off into holes in the ground.
The complaint further that the State constructed a four lane highway in 1958, and that by reason thereof the grade water fell upon 1,500 feet of the highway, ran off into a 6 x 6 cattle pass located under the railroad, and was then cast upon 1.63 acres belonging to claimants.
There is a dispute in the record as to whether the 6x6 underpass flooded upon the area prior to the construction of the highway. However, joint exhibits Nos. 1 and 2 indicate that the watershed drained generally to the east and into the Illinois River.
Exhibit No. 2 also « four lane highw:
loses that to the west on a fairly large subdivision ¢ which would likewise drain under the highway and rai th ction.
road underpass in an easterly di “Whi Setvient estate m ditches and dr.
There what the run-off from t highwe on would iner across the servient tenement owned by claimants.
difficulty is apportioning the amount of the flow, a [*397] would appear that the whole area involved consisted of about 250 acres.
The evidence discloses that the only damage was to the north 75 feet of the 1.63 acre tract, and that the value of the tract, if not flooded, would have been between $1,000.00 and $1,500.00. That by reason of the flooding of said tract the value would be not more than $200.00 per acre, and would probably be of no value.
An award is, therefore, made to claimants in the amount of $1,000.00.