Grisert-Hopeman v. Iniinors

24 Ill. Ct. Cl. 509 Illinois Court of Claims Filed July 24, 1964 No. 5131
Disposition: (No. 5131-Claimant awarded $3,661.05.) Award: $3,661.05
Cite as: Grisert-Hopeman v. Iniinors, 24 Ill. Ct. Cl. 509 (1964)
Lapsed Appropriation 24 awarded 1960s Grisert-Hopeman v. Iniinors 24 Ill. Ct. Cl. 509 July 24, 1964 (No. 5131-Claimant awarded $3,661.05.) /opinions/v24-p0554-1/

Grisert-Hopeman, Inc., A Corporation, Claimant, v. SraTe or Iniinors, Respondent.

Headnotes

  1. Contracts-lapsed appropriation. Where evidence showed that the only reason claim was not paid was due to the fact that, prior to the time a statement was presented, the appropriation lapsed, an award will be made.

This claim is based upon a contract for electrical work, together with materials, which were furnished by claimant to the Division of Architecture and Engineering of the Department of Public Works and Buildings of the State of Illinois. Said contract is evidenced by claimant’s exhibit attached to the original claim.

Subsequently, a stipulation was duly entered into by and between claimant and the office of the Attorney General for the State of Illinois. The stipulation provides in part as follows: That claimant under contract No. 71531 furnished materials and performed work for respondent in air conditioning the offices of the Department of Registration at the State of Illinois Building, 160 North LaSalle Street, Chicago, Illinois; that claimant presented its bill to respondent, and that the same was not paid, because the biennium appropriation from which it was payable had lapsed; that claimant is the owner of said claim; that no assignment or transfer of the claim in this cause, or any part thereof or interest therein, has been made by claimant herein; and, that there is due and owing from respondent, the State of Illinois, to claimant herein, after allowing all just credits, the sum of $3,661.05.

[*510] The only question presented here is whether or not an award can be made for the balance due on the contract above referred to where the appropriation has lapsed.

Where a contract with the State has been (1) properly entered into; (2) services satisfactorily performed, and materials furnished in accordance with such contract; (3) proper charges made therefor; and, (4) adequate funds were available at the time the contract was entered into, this Court will enter an award for the amount due. National Korectaire Company vs. State of Illinois, 22 C.C.R. 302. It appears that all qualifications for an award have been met in the instant case.

Claimant is hereby awarded the sum of $3,661.05.

Official volume 24 (Containing cases in which opinions were filed and orders of dismissal entered, without opinion between: November 16, 1960–August 20, 1964)  ·  All opinions in this volume  ·  Also on CourtListener

This text is OCR/derived from the official volume and may contain errors. The PDF is authoritative. Boundary pages shared with the adjacent opinion are reproduced whole, so the page image may show a neighbor's opening or closing lines; the transcript text itself is opinion-scoped. See About & sources.